I need clarification for the below issue.
- I have designed state machine approval workflow through VS2010.
- It was worked fine for 3 months and now it is taking long time for each level of execution.
I have checked the running workflow instances in site, it is around 1800 instances for each sub site.
Application: SharePoint Foundation 2010
Farm configuration
| Web server | Application Server | Database Server |
Processor | Intel® Xeon® CPU E5-26670 0 @2.90GHz 2.89GHz | Intel® Xeon® CPU E5-26670 0 @2.90GHz 2.89GHz | Intel® Xeon® CPU E5-26670 0 @2.90GHz 2.89GHz |
RAM | 8 GB | 8 GB | 14 GB |
OS | Windows Server 2008 R2 SP 1 | Windows Server 2008 R2 SP 1 | Windows Server 2008 R2 SP 1 |
Anandhan.S Remember to 'mark or propose as answer' or 'vote as helpful' as appropriate.