I have one SharePoint 2010 Application Server and one SQL 2008 R2 Database Server running on Windows Server 2010 R2. I am taking Farm Backup through a UNC path in another machine. The Backup was running fine in the past weeks but from the last week I am having a problem-
The Backup is being completed with some Warnings and at the same time, the Backup files are almost 50% lesser than the full Backup. My full Farm Backup file size was 230 GB but now its 147 GB. All Timer Jobs are running and permissions are ok as the Backup was running successfully in the last week. I am providing the Warnings below:
[8/1/2013 5:35:17 PM] Warning: [WSS_Content_Test] Timeout expired. The timeout period elapsed prior to completion of the operation or the server is not responding.
[8/1/2013 5:35:18 PM] Warning: [WSS_Content_Test] SQL command failed and needs to be restarted. The command will be re-started a total of three times before throwing an exception.
[8/1/2013 6:17:29 PM] Warning: [Search_Service_Application_2nd_CrawlStoreDB_Test] Timeout expired. The timeout period elapsed prior to completion of the operation or the server is not responding.
[8/1/2013 6:17:30 PM] Warning: [Search_Service_Application_2nd_CrawlStoreDB_Test] SQL command failed and needs to be restarted. The command will be re-started a total of three times before throwing an exception.
[8/2/2013 2:52:18 AM] Verbose: Starting object: job-diskquota-warning.
Thanks in advance for your support.