i everyone, i have some troubles moving a site, maybe you could help?
The whole point is to change the database hosting the site, because this site gets too big to be handled by the main database.
so, i made an export with stsadm -o.
i laso created a new DB, with higher values than the main one, and a new site collection.
i then reimported everything.
Here, my first problems arose:some files didn't transfer: mainly layout pages.i copied them with designer.
Then, everyhting seemed to be working more or less right, but i am now unable tomodify the web pages. i get the following error:
System.Web.HttpException: Délai d'attente de la demande dépassé. (which means TIMEOUT)
and a little bit later (in the same second)
an SPrquest object was not disposed before the end of this thread. To avoid wasting system resources, dispose of this object or its parent (such as an SPSite or SPWeb) as soon as you are done using it. This object will now be disposed. Allocation Id: {94A81494-DF99-4EE5-8AF2-1409AF884704} To determine where this object was allocated, set Microsoft.SharePoint.Administration.SPWebService.ContentService.CollectSPRequestAllocationCallStacks = true.
Any idea where should i look into?
or if i did anything wrong?
thanks in advance